
2026 marks the first full year of comprehensive implementation of China's national standard for pre-cooked (ready-to-cook) food. After the industry-wide rectification in 2024 and the standard-setting efforts in 2025, the pre-cooked food sector is transitioning from "ungoverned expansion" toward "standardized and regulated development."
## Three Major Changes After National Standard Implementation
### Change 1: Sharply Raised Entry Barriers
The national standard for pre-cooked food requires manufacturers to have a complete HACCP certification system, production equipment made of food-grade 304 stainless steel, and production environments compliant with GMP requirements. This means a large number of non-compliant small workshops are being phased out, while standardized enterprises are presented with significant growth opportunities.
### Change 2: Surging Demand for Cold Chain Equipment
The national standard explicitly mandates full cold chain control for pre-cooked food products, with temperature data throughout the entire process — from production to delivery — required to be traceable. In Q1 2026, procurement volumes of rapid-freezing tunnels, cold storage facilities, and refrigerated trucks surged 53% year-over-year.
### Change 3: Packaging Standardization Reshapes Production Lines
Uniform packaging specifications and standardized labeling requirements are driving upgrades in packaging equipment. Modified atmosphere packaging (MAP) machines, vacuum packaging machines, and integrated automatic weighing and labeling systems have become standard equipment in central kitchens.
## Shunxiang Central Kitchen's Pre-Cooked Food Equipment Solution
The "Pre-Cooked Food Specialized Equipment Package" launched by Shunxiang Central Kitchen at the end of 2025 precisely addresses the requirements of the national standard:
| Module | Equipment | Corresponding National Standard Clause |
|--------|-----------|--------------------------------------|
| Raw Material Processing | Fully automatic washing and cutting line | Hygiene standards for raw material preprocessing |
| Cooking & Processing | Intelligent steam-roast combination oven | Temperature + time recording for thermal processing |
| Quick-Freezing & Freshness Lock | Rapid-freezing tunnel (-40°C) | Quick-freezing temperature requirements |
| Packaging | MAP machine + vacuum packaging | Packaging seal integrity standards |
> Get the "National Standard Pre-Cooked Food Equipment Adaptation Guide" PDF
评论已关闭